2022 Home Building Project

January

First load of building materials

February

Back Hoe unloading

Wayne’s Excavation – Randy

Self explanatory …

March

The pump truck spend 30 minutes setting up …

Torqueing the screw piles to the engineer’s specification.

Sieg Goetz, General Contractor

April

Ephraim making drains

Deck testing

Jeremy and Moises

May

Levelling

Bathroom will be here!

Crawl Space

June

July

Jeremy Goetz had a running battle with Pippin “that rascally dog”

In Floor Heating

Double drain basins is an innovative solution to our curbless, curtainless shower

August

Moises

Sal, The Tile Guy

“That Rascally Dog”

Building the closets

September

October

Glass Deck Railing

Finished view

Finished accessible, two shower, curbless, curtainless bath (with tub)

December

Heat Pump for heating and cooling

Baseboard heaters for cold weather backup